West End Hotel
About the Project
In advance of a major redevelopment scheme Derisk carried out an asbestos survey of this site which comprised of a number of adjoining buildings in the heart of the West End. A wide variety of asbestos containing materials were identified including thermal insulation and associated residue, asbestos insulation board ceilings and fire breaks, textured coatings, asbestos containing adhesive, stair nosings and asbestos rope. Decontaminate successfully tendered for the asbestos removal works which they carefully completed over 18 weeks to enable follow on works to commence safely.
Materials removed:
- Asbestos thermal insulation residue
- Asbestos insulation board
- Textured coating
- Thermoplastic floor coverings
- Asbestos rope
Project Challenges
- Working on a site with restricted access